Sofa Dreams Leather Living Landscape Palermo U Shape Black White

This sofa is available in other colour combinations. To make a difference, please take note of our team at 030/63222230 will advise or why not leave the words.
40
The sofa is variety with poly Äther cold foam filling. The additional special wave spring prevents the deformation normally on the seat that. This type of suspension also allows for the firmness this item of furniture. The sturdy frame is made from a robust, against cracks durable wood.

Description

Repräse Ntativ, stylish and comfortable to your new living room set? Then take a look at the Leather Sofa Palermo in U-shape. This presents itself Optical as original as tastefully and is full of surprises. As well as adjustable head rests the sofa Palermo has its own lighting. To the One in the sides Built-in LEDs shine in different colours. Is needed handle grips on the touch wheel Remote control to to care for a cosy atmosphere in your living room. A comfortable sit and lie ensures open coil spring. You’ll get to cherish the sofa even at high loads nice and tight. It also prevents your unsightly warping. In this way helps to do this, that the living space Palermo is still after years been so comfortable like the day you bought it.
This sofa is available in other colour combinations. To make a difference, please take note of our team at 030/63222230 will advise or why not leave the words.
40
The sofa is variety with poly Äther cold foam filling. The additional special wave spring prevents the deformation normally on the seat that. This type of suspension also allows for the firmness this item of furniture. The sturdy frame is made from a robust, against cracks durable wood.
The sofa is variety with poly Äther cold foam filling. The additional special Bonell Spring prevents the deformation normally on the seat that. This type of suspension also allows for the firmness this item of furniture. The sturdy frame is made from a robust, against cracks durable wood.

Additional information

Brand

CatalogNumberList

EAN

EANList

ItemDimensions

Label

Manufacturer

ProductGroup

ProductTypeName

Publisher

Studio

Reviews

There are no reviews yet.

Be the first to review “Sofa Dreams Leather Living Landscape Palermo U Shape Black White”

Your email address will not be published. Required fields are marked *